TAG repaired defective sections of the A11's continuously reinforced concrete pavement in sub-zero conditions, handing the road back to traffic every morning of a tight two-week programme.
TAG put four different repair materials through their paces on the A14, isolating the rapid-set CSA concrete as the most reliable performer under pressure.
TAG replaced six concrete bays carrying live manhole access on the M25, working a seven-hour weekend window in freezing conditions without a single overrun.
TAG built the River Mole Bridge in Horley to a detailed pre-planned sequence, delivered on time, within budget, and accepted promptly by the adopting authority.
TAG installed all 86 precast bridge units on the Hogarth Flyover's rapid refurbishment, finishing ahead of schedule and earning coverage in New Civil Engineer.